A village-scale first step studied lot by lot on a permitted business park in central Maine. Published in full, constraints included, and not by name: the owner and the town will hear from us before they read about themselves here. Conceptual image, Maine Vision 2040.
About 285 acres at an interstate interchange, owned by a regional development authority on behalf of two dozen towns and ten minutes from a service-center town. The subdivision is fully permitted by the state, the highway department and the Army Corps. Fiber and natural gas are on the lots. The covenants already list data centers as an approved use, alongside research, light manufacturing and healthcare. The host town's council has said publicly that it would rather recruit a data center than restrict one. Everything on this page comes from the park's public listing, its recorded subdivision plat, utility and elevation data, and local reporting.
Lot A is a 20.8-acre wedge between two cleared utility corridors at the back of the park. Two 10 megawatt halls, 400 by 150 feet each, sit end to end along the corridor on the 250-foot shoulder. Cooling, generators, battery and the substation go on a lower terrace behind them. A berm and tree ring close the corridor and village sides. The service side faces the corridor, which is the only place the halls are meant to be seen from.
Lot B is 28 acres, but its southeasterly 14.1 acres are held in their natural state by the recorded plat, permanently, with a vernal pool inside. On the usable north part: a loop lane, about 30 homes in Maine clapboard, a green, and a few shops at the end of the lane. A 50-foot access strip between the lots becomes a walking path to the existing neighborhood on one side and the park road on the other. The wild 14 acres are the village's woods.

Lot A is not flat. It runs about 260 feet along the corridor and falls roughly ten percent to the north, to a swale near a small pond at about 200 feet, then drops off its northwest corner toward the water at 150 feet. The buildable ground is the shoulder along the corridor, which is why the halls go end to end rather than side by side. The plant sits on the terrace behind, 20 to 40 feet lower, out of sight.
The park road and its office buildings sit at 290 to 360 feet. Both lots sit 50 to 100 feet below that. From anywhere in the park the halls are below the ridge. Lot B's usable ground is gentle, 234 to 256 feet, and drains toward the natural area it borders.



The aerial at the top of the page is the third: the village in front, the tree band, the halls low along the corridor, the water beyond. All three are concept renders drawn from the plan above, not engineering.
A dedicated 34.5 kV feeder from the substation, or a 115 kV tap to a customer substation. Which one, at what cost and when, is a utility will-serve request that has not yet been made. It is the whole question.
Homes and shops are not permitted uses in the park today. The village needs a covenant amendment from the authority and a zoning change from the town for one lot. The 14.1 natural acres cannot be changed by either.
The park's size and parking guidelines were written for offices. A data hall needs variances on both, and the 30 percent footprint limit applies to halls, plant and yards together.
Pipeline gas serves the lots; capacity for honestly labeled bridge generation is unconfirmed. Town water and sewer capacity for a closed-loop liquid-cooled campus with a small summer trim is unconfirmed.